Our Works

logo-icon

Works done and to be done by the institution:

Shri Hanuman Seva Samiti (Regd.)

🚩 Shri Balaji Mandir, dedicated to the all-round development of Shri Salasar Balaji Dham, has full cooperation in the following works. Works done and to be done by Shri Hanuman Seva Samiti

Introduction:-

🚩 The organization was duly registered in 1980. Even before this, this organization has been doing philanthropic work. In this organization, 25 persons including the president are members of the executive.

Objective:-

(A) To do social service and philanthropic work and to inspire others to do it.

(B) To provide essential facilities to the visitors free of cost without any caste, class and discrimination.

(C) To make complete arrangements for fairs.

(D) To arrange for cold drinking water, to set up pyaau at various places.

(E) To work in the field of education, medicine and environment.

(F) To construct houses and Dharamshalas for the accommodation of the travellers.

history history

1. Medical :-

– Works done :-

(A) Except Homoeopathic Hospital building, General Hospital building, Mother-Child Welfare Center building, “A” category Ayurveda Hospital building were constructed and handed over to the government.

(B) Shri Balaji Medical Relief Society building was handed over to Srijan Charitable Trust, which was reconstructed by them with ultra-modern system.

(C) Organizing free medical camps.

(D) Keeping 2 ambulances ready at all times.

– Works to be done :-

(A) Getting ICU ward constructed.

(B) Getting medical dispensary constructed in the temple premises.

history

2. Education:-

– Works done:-

(A) Construction of buildings of Senior Secondary School, Girls High School, Senior Upadhyay level Sanskrit School, Government Damodarlal Saravgi Girls High School and construction of rooms in Primary School.

(B) Construction of Sanskrit Mahavidyalaya building.

– Works to be done:-

(A) Construction of 2 new buildings in Sanskrit Mahavidyalaya campus.

(B) Construction of Gurukul Bhawan in which the ancient education system of India is linked with modernity, revived and its benefits are taken.

history

3. Electricity:-

– Works done:-

(A) 7 High-Mast lights.

(B) Street lights in entire Salasar.

(C) Maintenance and expenditure of all other lights installed in all public places of Salasar Dham.

(A) 4 High-Mast lights.

(B) All cable-wiring to be laid underground.

(C) Installation of solar power plants on a large scale, so that electricity can be arranged in all public places of this Dham through this natural resource.

history

4. Cleanliness and Environment:-

– Works done:-

(A) Cleaning of entire village by private cleaners. (Morning and evening)

(B) In case of water accumulation, water drainage through private pump sets.

(C) Planting of trees on both sides of the roads in Salasar and its surrounding areas and cleaning and planting of trees at Balaji.

(D) 2.5 MLD STP Plant has been installed.

– Works done:-

(A) Sewerage treatment plant

(B) Waste compost recycle plant (garbage disposal machine)

(C) Construction of Beepsaktmad Park in Shri Balaji Garden and modernization of the garden by organizing it.

(D) Installation of a grand tricolor flag in Shri Balaji Garden.

history

5. Road and parking:-

-Works done:-

(A) Construction and maintenance of all cemented roads in Salasar.

(B) Construction of 4 new free parking spaces.

– Works to be done:-

(A) Construction of cemented roads up to 5 km at various locations.

(B) Construction of a large parking lot at the vacant space near Shri Balaji Garden.

(C) Construction of entrance gates on the roads leading to Salasar.

history

6. Water:-

-Work done:-

(A) Arrangement for providing water pouches to visitors through R.O. plant. (by packing machines)

(B) Providing water through water tankers in places where there is scarcity of water in summer and distribution of 2000 litre plastic tanks for drinking water in villages from time to time.

(C) Operation of water coolers and drinking water stalls at various places and supply of water to public places, Dharamshalas and schools through big water tanks.

(D) Purchase of land for overhead water tank and handing it over to the Water Supply Department.

(E) Construction of 3 new drinking water stalls in a modern way.

– Works to be done:-

(A) Construction of rain water harvesting system.

history

7. Accommodation arrangement:-

(A) Construction of more than 25 Dharamshalas by motivating donors and providing free land for the convenience of travellers.

8. Traveller and fair management:-

-Works being done:-

(A) Construction of 3 overbridges and 1 underpass and iron railings for traveller convenience.

(B) Construction of wooden floor with cooling plant in the entire fair ground.

(C) Provision of 3 new permanent Sulabh complexes, 2 new mobile toilets.

(D) Free arrangement of food, accommodation and

medicines for traveller convenience and service-minded people working in the management.

(E) 24/7 surveillance for security in the entire Salasar village by 20 IP cameras and more than 160 HD cameras and strict security check before the entrance gate inside the temple by 4 new metal detectors.

(F) Prohibition of entry of traffic and stray animals in the temple premises by more than 20 private guards. And with government assistance, there is a provision for small and two wheeler vehicles.

history